• M/E - HVAC
  • PROJECTS
  • CONTACT
  • +62-21-850-2122
  • marketing@suryasemesta.co.id
  • ► WEBMAIL

PT SURYA SEMESTA INDONESIA

ENGINEERING/ PROCUREMENT/ CONSTRUCTIONS

MECHANICAL/ ELECTRICAL/ INSTRUMENTATIONS/ HVAC

UJUNG PANGKAH DEVELOPMENT OFFSHORE
PHASE II (WHP-B EPCC) / Offshore

HVAC System Engineering, Procurement and Construction (EPC)
Owner: Hess (Indonesia-Pangkah) Ltd.

Coil condenser Ducting arrangement Diffuser Filter unitReturn Chamber Junction Box Flexible Duct Cable TrayDucting Elbow Pneumatic Fire Damper Power Junction Box Ductwork Ductwork Ductwork Ductwork Ductwork Ductwork Control Panel Temperature Sensor Return Chamber Duct Heater Control Box Hess Platform Ductwork Ductwork Duct Heater Control Box Temperature Sensor Control Panel Control Panel Duct work Pneumatic Fire Damper Pressure Relief Damper Supply Grille Pressure Differential Indicator Istrument work Ducting Elbow Duct work Stainless Steel AC unit Stainless Steel AC unit Gas etector Pneumatic Fire Damper Hess Platform Control Panel Control Panel Control Panel Pneumatic Fire Damper Pneumatic Fire Damper Fan Stainless Steel AC unit Pneumatic Fire Damper Cable Tray Cheers... Pneumatic Fire Damper Hess Platform Stainless Steel AC unit Ducting work Explosion Proof Junction Box Control Panel Piping Baldor tag name Copeland Compressor Stainless Steel AC Unit Fabrication Stainless Steel AC Unit Fabrication Stainless Steel AC Unit Fabrication Stainless Steel AC Unit Fabrication Stainless Steel AC Unit Fabrication Junction Box Stainless Steel AC Unit Fabrication Stainless Steel AC Unit Fabrication Stainless Steel AC Unit Fabrication PLC Cotrol Panel work PLC Cotrol Panel work PLC Cotrol Panel work PLC Cotrol Panel work PLC Cotrol Panel work PLC Cotrol Panel work PLC Cotrol Panel work PLC Cotrol Panel work PLC Cotrol Panel work PLC Cotrol Panel work PLC Cotrol Panel work PLC Cotrol Panel work PLC Cotrol Panel work

Project
project list (.pdf) download ▼


  • UJUNG PANGKAH DEVELOPMENT OFFSHORE
    PHASE II (WHP-B EPCC) / Offshore
    HVAC System Engineering, Procurement and Construction (EPC)
    Owner: Hess (Indonesia-Pangkah) Ltd.
  • HVAC SYSTEM FOR NGL FIRE & GAS AND UNIFORM FIRE & GAS PROJECT / Offshore
    HVAC System Engineering, Procurement and Installation Supervision
    Owner: BP West Java
  • BETARA COMPLEX DEVELOPMENT (BCD) / Onshore
    HVAC Supply and Installation
    Owner: PetroChina International Jabung, Ltd
  • MM FIRE & GAS PROTECTION UPGRADE PHASE 1, MIKE‐MIKE PLATFORM / Offshore
    WJ PO of Isolation Damper and Ducting for HVAC System
    Owner: BP West Java
  • UJUNG PANGKAH DEVELOPMENT PROJECT / Onshore
    Mechanical, Electrical and Fire Fighting Supply and Construction
    Owner: Hess (Indonesia-Pangkah) Ltd.
  • OYONG DEVELOPMENT PROJECT PHASE II ONSHORE PROCESSING FACILITIES (OPF) GRATI / Onshore
    HVAC System Engineering, Procurement and Construction (EPC)
    Owner: SANTOS (SAMPANG) PTY LTD
  • CHEVRON GEOTHERMAL DARAJAT UNIT 2 POWER PLANT / Onshore
    HVAC System Inspection and Evaluation, Ducting Replacement TAR-09
    Owner: CHEVRON GEOTHERMAL INDONESIA

PT SURYA SEMESTA INDONESIA

MONCOKERTO RAYA I NO.20

UTAN KAYU SELATAN

JAKARTA 13120

INDONESIA

+62 21-850-2122

marketing@suryasemesta.co.id

Copyright © 2011
PT Surya Semesta Indonesia.
All rights reserved.